This is an archival version of the original KnowledgePoint website.

Interactive features have been disabled and some pages and links have been removed.

Visit the new KnowledgePoint website at https://www.knowledgepoint.org.

 

Revision history [back]

click to hide/show revision 1
initial version
RedR TSS gravatar image
RedR TSS

Pauline, David,

There has been a lot of work done at de Montford Unicversity by the De Montofrd Medical Waste Incinerator Group (MWIG) that was set up by Pofessor Picken, who I believe has now retired, but possibly still active. They have a website https://www.mw-incinerator.info/en/301_structure.html and also a series of designs. The largest capacity seems to be 50 kg per hour of waste, which may be sufficient for your needs, but I am sure they would be able to provide assistance if a larger capacity would berequired.

I hope this helps,

Regards,

Jeff